MANILA, Philippines — The government is eyeing the filing of charges against the Discayas over poor structural design and unfinished work of the Philippine Film Heritage Building (PFHB) in Intramuros, Manila, Malacañang said Thursday.
Govt eyes charges vs Discayas over 'unfinished' PH Film Heritage Building
Palace Press Officer Claire Castro discovered the sloppy construction of the film center during her inspection of the PFHB that was supposed to be completed Sept. 4, 2025., This news data comes from:http://erlvyiwan.com
Castro said the PFHB was built by the Discaya-owned Great Pacific Builders and General Contractor Inc.
"This building should be turned over now because that it's supposedly finished, Sept. 4, 2025. We can see now how it's built and why it's disappointing," Castro told reporters after inspecting the film center.
Govt eyes charges vs Discayas over 'unfinished' PH Film Heritage Building

"And this building, its contractor is Great Pacific Builders and General Contractor Inc. This is one of the corporations of the Discayas," she added.
- 15 people hospitalized after double-decker bus crashes outside London's Victoria Station
- BuCor chief calls for major reforms
- BIR to audit contractors flagged for ghost flood projects for tax fraud — BIR
- Undersea cables cut in the Red Sea, disrupting internet access in Asia and the Mideast
- China's Xi holds talks with North Korea's Kim in Beijing
- Filipino member of AHOF K-pop group says Manila concert a dream come true
- Napolcom welcomes Nartatez’s move to recall Torre’s reassignments
- Surfacing of WPS features ‘likely’ natural occurrence, not due to dumped crushed corals
- Trump moves to cut more foreign aid, risking shutdown
- ‘Large shark’ kills man off Sydney beach